The brief

A trading company's main office needed a larger cassette, and its servicing taken over.

What we found

  • The existing refrigerant run was not worth reusing for a new, larger unit.

What we recommended

Install the new cassette on new pipework and pressure-test it, rather than reuse a run of unknown condition.

The work

  • Supply and installation of a 36,000 Btu ceiling cassette system serving the main office
  • New refrigerant pipework in SWG 22 copper with class 0 insulation
  • Pressure test on the completed pipework, and a return attendance to check it
  • Servicing across two rooms and the lobby, and a compressor chemical jet wash

The result

The office runs on a new system on new pipework, and the same contractor services it.