Shophouse venue at Boat Quay

A three-level shophouse venue re-cooled unit by unit: what to keep, what to replace, each space sized for how it is used, grant-ready equipment, and condensers moved off a roof nobody could reach.

Illustration, not a drawing of the site

The brief

A venue with a restaurant on the ground floor, an event space above and an office on the mezzanine was moving into a shophouse. The upper levels' air-conditioning was old and struggling, and the client wanted to spend only where it mattered.

What we found

  • Our condition assessment went unit by unit: one would not start and had a corroded, choked coil; one had a worn compressor and failing fan motors; one barely moved air; one shut itself off 30 seconds after starting as its compressor overheated; one squealed and cooled weakly.
  • Parts for the old units were no longer readily available, so repairs were not economical over the long term.
  • Two of the weakest units served areas that larger units nearby could cover once replaced.
  • The old condensers sat on a roof with no ladder, stair or access point, and the new ones weigh over 60 kg each, with a glass skylight in the way.

What we recommended

Size each space for how it is used: the event space for a crowd, the office for a few people. Replace the failing systems with fewer, larger units and drop two units altogether, rather than replacing like for like. Specify equipment that qualifies for the Energy Efficiency Grant, which can cover up to 70% of qualifying equipment cost. And mount the new condensers on the rear wall beside a window, reached from inside, with the old rooftop units left in place, disconnected.

The work

  • Condition assessment of every existing unit, with a keep, replace or remove recommendation for each
  • Site assessment report for the landlord on the condenser position and the safe installation method
  • Mitsubishi Heavy Industries and Midea multi-split systems for the event space and the office mezzanine
  • Condensers on stainless steel brackets on the rear wall, lifted in through the window over a boarded skylight
  • Old rooftop units disconnected and terminated in place
  • Two VRF indoor units at the previous premises reinstated for handover
  • Chemical servicing after handover

The result

The venue runs on fewer, newer units sized to each space, on equipment eligible for the grant, and every condenser can be serviced through the window, with no scaffolding and no roof access, for as long as it is in use.