Industrial

Factory at Tuas

New air-conditioning across a factory's server room, logistics office, isolation room and office, with the server room on two units that share the duty and both start if the room warms, and the existing VRF plant put right.

Illustration, not a drawing of the site

The brief

A manufacturer needed new air-conditioning in four areas over three floors, and a server room that stays cool without anyone watching it. Its existing VRF plant was also short of refrigerant and had a failing fan.

What we found

  • A server room on a single unit has no cover when that unit stops.
  • Adapting the existing control panel to run the new units, where it allowed, would save replacing it.
  • On the VRF plant, one condensing unit was decommissioned and its refrigerant could be recovered; another was short of charge and had a faulty fan.

What we recommended

Two ceiling-suspended units for the server room, alternating duty every 12 hours so they wear evenly, with the existing panel modified to start both if the room passes 20°C. Wall-mounted units for the logistics office and a multi-split for the isolation room and the office. For the VRF plant: recover the gas from the decommissioned unit, charge the other, swap in the decommissioned unit's working fan, and check every condensing unit so parts in poor condition can be watched or replaced before they fail.

The work

  • Server room: two Daikin ceiling-suspended systems on new pipework, isolators, brackets and water trays; control panel modified for 12-hour duty switching and automatic start of both above 20°C
  • Logistics office: two Mitsubishi Electric wall-mounted systems
  • Isolation room and office: a Mitsubishi Electric multi-split
  • VRF plant: refrigerant recovered from the decommissioned condensing unit, 26 kg charged to another, its faulty fan replaced, and every condensing unit checked with parts recommended

The result

The server room has a standby unit that takes over by itself, and both run if the room warms. Four areas run on new equipment, and the VRF plant has a written list of what to watch.