
Industrial
Factory at Tuas
Four areas re-cooled, a self-switching server room, and the VRF plant put right.
A refrigerant leak traced and fixed, not topped up again.

A packaging factory's units kept losing cooling, and had been topped up before.
Find and fix the leak before adding any gas, and put the eleven indoor units on a fixed servicing cycle.
The system holds its charge, and the units are on a schedule rather than called out when they fail.